Tuesday, October 31, 2017

Rebuild Day 30

Trick or Treat!

I waited to touch base with Bob...and soon had a shopping list o_O

Kitchen on the Deck :/

In the time I was gone to Lowe's and back...Bruce & Andrew had the tiles stripped:



Dumpster when I left for work...

...and when I got back home:

Pressure Treated to sister floor joists, and Advantec tounge-and-groove OSB for the new sub floor.

I'm running out of room so we're shuffling things like the new cabinets back and forth

Temporary plywood down.

No comments: